Plate I · The solution

Steam, cooling – from heat that was wasted.

Our concept is innovative in that it not only uses waste heat to generate steam for sterilisation, but also operates absorption chillers to provide cooling.

Plate II · Pilot installation

Current process, new additional process.

Today, waste is loaded and incinerated, and the exhaust leaves at around 600 °C. The new additional process uses the available area next to the line for a heat exchanger, a steam generator and an absorption chiller.

CURRENT PROCESSNEW ADDITIONAL PROCESSLoadingmedical wasteIncineration2 lines · 35 t/dayExhaust600 °Ctoday: cooledand releasedHeatexchangerSteamgeneratorAbsorptionchillerSTEAMsterilisationCOOLINGplant & neighboursPOWERbeing explored
Waste heat, 600 °CRecovery routeUnder studyBiotic · Delhi
Plate III · The equipment

Three components, one route.

Each step takes energy that would otherwise be cooled off and released, and puts it to productive use.

AI-generated illustration of a plate heat exchanger, a steam generator and an absorption chiller
AI illustration · equipment types, models still to be selected
01

Heat exchanger

Captures heat from the flue gas before it is cooled and released.

02

Steam generator

Produces steam for sterilisation – a need the facility already has.

03

Absorption chiller

Turns heat into cooling for the plant itself and adjacent buildings.

Plate IV · What is new

A starting point for industrial symbiosis.

The cooling is foreseen to be used by the waste incineration plant itself and by buildings in the adjacent industrial area – a starting point for industrial symbiosis.

In addition, the project will explore a novel approach: using cooling derived from waste heat directly for certain sterilisation processes.

Together, this maximises resource efficiency by putting otherwise lost energy to productive use.

AI-generated concept of heat-recovery equipment next to an incineration line
AI concept illustration · a proposed arrangement, not the installed pilot
Plate V · Join the initiative

Help build the next installations.

We welcome industry partners at an early stage, to make heat recovery from incineration affordable, standardised and easy to retrofit.

Technology suppliers
Engineering services
Investors
Public institutions
Universities & colleges
Research institutes

Peter Anderberg, Overall Project Leader · Heatnet Global